A Class C Gets a New Cabover

We just completed repairing this Class C. The cabover was rotting from the inside out due to old caulking that had cracked around places like the overhead air vent and was leaking for what must have been at lease a couple years. With damage this serious and far reaching we had to remove and rebuild the entire cabover to it’s original specs inside and out. From unusable to being brand new, the owners were overjoyed to get their RV back in time for their next trip and looking so good. A special thanks to my awesome crew for another job well done!

21192710_1406122586109413_4052298159717435373_nIMG_2213IMG_2215IMG_2216Screen Shot 2017-08-30 at 7.39.14 AM

Advertisements

New Flooring for this Coach Requires the Slide-out to Come Out.

This Coach needed the flooring replaced around the slide-out. To do the job correctly, we must completely remove the entire slide-out from the coach. After that it’s a basic flooring job, but re-installing the slide-out is not a job for the faint of heart and inexperienced. This is a common job at Almaden RV, so obtaining perfect alignment and fit when the slid-out is fully retracted is not a problem as well as a free flowing full extension.

IMG_4426IMG_4427

Luxury Coach – Will be Good As New

A panel on this huge luxury coach was severely damaged and it’s a good size job to replace. Our technician is carefully cutting, bending and shaping this sheet of metal into proper form and fit. After that, it will be carefully riveted into place for a secure and perfect factory finish. Then off to paint. Over time, we have completed many jobs like this and received great customer satisfaction, so no job is too big. When it’s all said and done, this luxury coach will look as good as new.